Single portfolio item: The decision to refurbish

Authors Avatar

Course Title: Rehabilitation & Conservation Studies

BUIL1107

Single portfolio item: The decision to refurbish

It is important for surveyors to convey to their client whether members of the public, builder or contractors in general proper care in establishing the variables that will affect any given project. Time upon reflecting these variables and the implications that can bring to a project need to be carefully reviewed, whether from a traditional procurement route or form example a design and build method.

According to the ‘Building Adaptation’ James Douglas (2006) there are three main reasons why buildings get to a refurbishment stage:

  1. Construction standards and requirements are continually improving because of government policy to enchase energy efficiency and building performance.
  2. Wear and tear as well as exposure to the elements results in ongoing deterioration or other adverse change in the building structure and fabric.
  3. Advances in technology and rising demand by consumers and workers for better and more comfortable internal environment have prompted the need for ongoing modernization of buildings.

                                                                                               Douglas (2006)

In reviewing these factors is it feasible to determine the relevant specifics whether to demolish a particular building? As new buildings through poor workmanship can also cause snagging problems or greater issues after practical completion. Therefore a written record of what has to be done in form of a pre-condition report is to be completed to ascertain all factors whether to reinstate, through either refurbishment or to demolish. Of course other variables such as the client’s costs programme and end user use must all be taken unto account, the current climate of environmental and carbon footprint issues continue to be an ever enforcing element with construction. Only when such a report is commissioned can it determine that the building is ‘statutory defective’ can the final decision of a building to be torn down can be decided. This can also be called a dilapidation report.

Join now!

In evaluating the varied mechanisms by which buildings are deemed to fail refurbishments is the valid reason to unsure that such a pre-condition report is submitted to the relevant parties to see much works are required to re-instate the building whether to its original form or improvements to current building regulation standards.

An example of how the government is seeking to explore refurbishments activity into existing dwellings was the introduction of the Home Condition Reports (HCR) in 2004 which formed part of the Housing Act 2004. It is intended to aid that of the general public placing their ...

This is a preview of the whole essay