• Join over 1.2 million students every month
  • Accelerate your learning by 29%
  • Unlimited access from just £6.99 per month
Page
  1. 1
    1
  2. 2
    2
  3. 3
    3
  4. 4
    4
  5. 5
    5
  6. 6
    6
  7. 7
    7
  8. 8
    8
  9. 9
    9
  10. 10
    10
  11. 11
    11
  12. 12
    12

The Egyptian Drilling Company.

Extracts from this document...

Introduction

Table of Contents Table of Content 1 Company overview 2 Project Objective 4 Project goal 5 Project Scope 6 Methodology 7 Project Deliverables 8 Project Documentation and Communication 9 Appendix 10 A1 11 A2 12 Company overview Establishment: The Egyptian Drilling Company is Egypt's largest drilling contractor, providing high quality drilling and workover service onshore and offshore.. Operating a rig fleet of more than 40 units, EDC is today the largest oil and gas service provider in the Middle East, with operations in Syria and Saudi Arabia in addition to the operations in Egypt. EDC has a long proven record of high quality performance, which has been acquired through experience, dedicated and highly trained personnel, excellent safety records, advanced computer systems and top quality equipment. EDC was formed in 1976 as a joint venture between the Egyptian General Petroleum Corporation (EGPC) and the A. P. Moller Group of Denmark. EGPC and A. P. Moller have acted since the company's inception as equal partners in ownership EGPC is Egypt's national petroleum corporation, overseeing oil and gas exploration, production, refining, marketing and distribution within the country. ...read more.

Middle

approved courses in all major areas. EDC's technical training abroad is primarily conducted in the Maersk Training Center in Svendborg, Denmark, which provides valuable and qualified technical courses. A management and administration personnel training abroad includes courses in Europe, USA and Dubai, UAE. Personnel from the Finance and Purchase Department are regularly trained in Moller Supply Services in Houston in the use of the purchase system and purchasing practices Market Share The company undergoes two main types of projects:- 1. Introducing new rig to the company service where rigs fall under three categories:- * Land rigs (also called "Super Rigs"): as the name implies, these type of rigs work in deserts, fields and any other type of lands which are expected to produce oil or gas * Jack-ups: they are offshore rigs which use jacks for rig fixation in the seabed. * Work-Over Rigs: these rigs are smaller than the land rigs where they are assigned to clean, plug and perform other auxiliary jobs for the well other than drilling which is only devoted to the super rigs. ...read more.

Conclusion

* The project will be aided with the software support of Microsoft Project. 5. Justifying systems as capital investments. (Benefit/cost analysis, risk management). The research will be supported with Benefit/cost analysis, risk management of the existing and the improved system. 6. Updating and revising scope at every stage of the research to make sure that the system analysis is in its right track. 7. Dividing and conquering the existing system. The existing system of EDC will be divided to several building blocks so that it can be easily analyzed and easily diagnosed. 8. Establish a Project time schedule to track the progress of the system development phases ( Refer to Gantt chart in Appendix (A1) Project Deliverables No Description Date 1 Project charter Monday 01/03/2004 2 System Analysis Report Monday 29/03.2004 3 Problem Identification & Analysis Report Monday 26/04/2004 4 Final Design Report Monday 24/05/2004 Project Documentation and Communication The following guidelines should be used for communications: * The project team will hold weekly status meetings (every Saturday at 12 pm) * Team members will utilize e-mail for communication * There will be an electronic briefcase for storing documents Appendix A1 A2 ?? ?? ?? ?? Phase 1 Project Proposal 1 ...read more.

The above preview is unformatted text

This student written piece of work is one of many that can be found in our AS and A Level Information Systems and Communication section.

Found what you're looking for?

  • Start learning 29% faster today
  • 150,000+ documents available
  • Just £6.99 a month

Not the one? Search for your essay title...
  • Join over 1.2 million students every month
  • Accelerate your learning by 29%
  • Unlimited access from just £6.99 per month

See related essaysSee related essays

Related AS and A Level Information Systems and Communication essays

  1. Marked by a teacher

    Database Coursework on a Vehicle Rental System: Analysis

    5 star(s)

    of information in the system and the efficiency of this flow General Findings about Current System Fred's Car Rentals currently has six members of staff, consisting of including the manager, assistant manager, stock controller and floor staff. The members of staff have a little experience in ICT.

  2. Marked by a teacher

    I have been asked to create an ICT solution for a local events and ...

    Introducing a new system can bring in many positive elements and benefits to the company ? EVDOP Live. In terms of costs, a new system across all boards within the company would drastically reduce expenditure therefore increasing the businesses revenue.

  1. Feasibility Report

    As a computerised system can easily crash, get viruses, spyware and Trojans, which can result in important files being deleted, for example, files containing details about customers orders, and also payments received by customers. In turn up to date antivirus and spyware software must be installed.

  2. Free essay

    ICT organisation project

    * An issue with the text which includes information about the schemes that implemented to combat the problem - there is a lot of information that needs to be included in this box and the actual names of the individual schemes are not apparent.

  1. ICT - Definition of scope

    to use, however not all customers will have a PC at home to insert the disk into, so we will have a computer set up in the store, so customers are able to use it to go through the disk and learn how to install the PC components.

  2. The Impact of Mobile Phones on social Interaction

    a result are not only allowing users to keep in greater contact but are also allowing them to increase their physical interaction. However due to the negative aspects such as the move towards a 24 hour work place problems of over reliance and poor etiquette, it may be fair to describe the dilemma as a two edged sword.

  1. Analysis Tools

    Processing will have to be designed to support each relationship, but the ERD doesn't suggest how that processing will be handled. 3. ERD's require a complementary design and documentation technique to handle processing needs and module decomposition. Perfect Pie and ERD An Entity Relationship diagram can be used as

  2. ICT revision notes - IT project management

    âSuch evaluation will involve returning to the original objectives and performance criteria. âEvaluation will involve discussions with management and users of the system after some time after it has been installed to gather their opinions as to the new system’s effectiveness.

  • Over 160,000 pieces
    of student written work
  • Annotated by
    experienced teachers
  • Ideas and feedback to
    improve your own work