Value and Risk Management

School of Built Environment

Heriot Watt University

ASSIGNMENT

VALUE AND RISK MANAGEMENT

Submitted by:

Anup Chellappen Nair

MSc. Construction Management (Project Management)

Registration Number: 071223616

   

Contents

Value Management Report                                                                        3

Introduction                                                                                                 3

 

The Specific issues to be evaluated during the

Value Management Study                                                                          4

The Role of Each Stake Holder Involved                                                 5

The Information Client will need to provide to the

Work shop Participants before Each Study                                             7

                     

Proposed Agenda for the Work Shop                                                       8

Conclusion                                                                                                   9

Risk Management Report                                                                         10

Introduction                                                                                               10

 

The Specific issues to be evaluated during the

Risk Management Study                                                                           11

The Role of Each Stake Holder Involved                                                12

The Information Client will need to provide to the

Work Shop Participants before Each Study                                           14

Proposed Agenda for the Work Shop                                                      15

Conclusion                                                                                                  16

 

References                                                                                                  17

Value Management Report

Introduction:

This report has been prepared to do a Value Management for the TechWatt Corporation and develop a strategy on how to tackle the study in order to achieve the maximum possible out put.

TechWatt Corporation is a small but fast growing IT company producing both computer hard ware and soft ware systems. The company is considering investing in a regional HQ as part of an ambitious expansion plan, and are about to commission a major project for this. An amount of £5 million has been allotted for the project but no major decision has been taken yet either on the site or the design of the facilities.

The basic requirements TechWatt expect to have from the facility are:

  • Provide an office accommodation for the management employees: i.e. a total of 12 staffs.
  • Provide a work shop for high tech light manufacturing processes: i.e. a total of 15 staffs.
  • Provide the ability to receive visits from clients and potential clients for meetings and to tour the facility.

The main stake holders included in the Value Management Study includes:

Client, Project Manager, Value Manager, Quantity Surveyor, Architect, Structural Engineer etc.

Join now!

The Specific issues to be evaluated during the Value Management Study:

Design of the project:

The design team has to decide upon the design of the project such as the type of building to be constructed, interiors etc.

Location of the Project:

The team has to look at the different sites available. The site should be easily accessible with good transport facility. It should be near to all the other offices of the TechWatt to have an easy link between all the offices.

Accommodation:

The accommodation should have a minimum ...