Operations in a shuttle loom

Extracts from this document...

Introduction

Operations in a shuttle loom The first operation in a shuttle loom is called shedding. This is where a gap is created in the warp so that the weft can go straight in through the gap. A hield frame is used to shed the warp, which only contains one yarn. So what happens is all the odd number warps would rise above the even number warps so that weft insertion could take place. The gap between the odd and even warps is known as the shed. There are three frames for odd warps and three frames for even warps. ...read more.

Middle

This is important as if the yarn becomes loose it can lead to knots which would slow down the process. The area between the yarn and the fabric is known as cloth fell which is the point of fabric formation. Beat up is the process where the weft gets pushed into the cloth fell. To do this a reed is needed. There are three to four ends in each dent, which are the gaps in each reed. Then what basically happens is that the ends get beat up into the fabric. Section warping is a method of assembling yarns. ...read more.

Conclusion

The warp then goes into a leasing reed and then into a guide reed which sets the width of each section which then gets wound onto the winding drum. At the end of each section a lease is placed in the warp to keep all the yarns separate from each other. After each section is wound on the yarns are cut and the yarn tails are tucked in so they don't get attached to the machine during other beaming operations. The beaming process is complete when the required numbers of sections are assembled onto the drum. After all this is completed the tails from each section are attached to the weavers beam and the beam is then rotated to draw off the warp yarn from the drum as a complete sheet. ...read more.

The above preview is unformatted text

This student written piece of work is one of many that can be found in our University Degree Software Engineering section.

Found what you're looking for?

  • Start learning 29% faster today
  • 150,000+ documents available
  • Just £6.99 a month

Not the one? Search for your essay title...
  • Join over 1.2 million students every month
  • Accelerate your learning by 29%
  • Unlimited access from just £6.99 per month

See related essaysSee related essays

Related University Degree Software Engineering essays

  1. MS Office solutions. Fantasy mobiles require: ...

    'display trainer name in document docStudents.Paragraphs(6).Range.Text = _ "Lecturer:" & vbTab & txtLecturer.Text & vbNewLine The above and following code implements at the click event of the 'OK' command button. The vbatask2 document is set to a variable and the range property is used to insert text from the form into paragraph six of the document.

  2. Creating a database system for Mr Azizur Rahman, Mr Bilal Sheikh and Mr Iman ...

    Data Protection: All customer information including contact number and address are kept in a file where other customer details are also kept. This file is not well protected; the file is placed in a drawer, from where anyone can access it.

  1. Human Computer Interaction Project.

    These studies test out products on the target users. The aim of the studies, according to Monk et al [3], is to pinpoint the problems that users experience when they use software products and to suggest changes that could be made to improve the products usability. The basic principle behind the thinking aloud method is that users are asked to think aloud as they perform a task.

  2. This report is to describe the process I went through to create a 3D ...

    next stage, bevelling the top polygon to give the desired effect of slanted edges. The screen then had to be added to this box. A box was used with parameters of approx length 240, width 304, height 2, and was moved directly over the already created top section.

  1. I have been asked to design, implement, maintain and evaluate a website for the ...

    It helps you schedule and track all your activities so you can stay on top of their progress. I will be using this to keep up to date with my tasks throughout the duration of the assignment. I have been given these deadlines:- Date set: 22nd October 2002 Date due:

  2. to help in the selection of tools that support the software quality management process.

    P�REZ, TERESITA ROJAS, ANNA GRIM�N LISI, Dpto. de Procesos y Sistemas, Universidad Sim�n Bol�var LUISA A. DE LUCA Dpto. de Gerencia de Sistemas de Informaci�n, Banco Central de Venezuela 18 SQP VOL. 4, NO. 4/(c) 2002, ASQ Selecting Tools for Software Quality Management more effectively in order to deliver competitive products to the market.

  1. Why is something needed? - We're about to reach the end of what might ...

    The lessons of the Y2K experience are twofold: such problems can indeed be overcome by dint of extraordinary effort and expenditures, but just as importantly, we rely upon computers far more than we fully realize until we're forced to step back and take notice of the true situation.

  2. Abstract This report is dedicated to demonstrating and critically reviewing new features and developments ...

    [14] Windows 7 again improves this technology in a number of ways. First, it's much simpler to implement BitLocker. Windows 7 will automatically create any needed hidden boot partitions instead of requiring users to do this manually as was the case in Windows Vista.

  • Over 160,000 pieces
    of student written work
  • Annotated by
    experienced teachers
  • Ideas and feedback to
    improve your own work