The clerk of works

Extracts from this document...

Introduction

My presentation is on the clerk of works. On all building sites there is one person who fulfils a unique role in the building team. That person is not part of the contractors staff but is appointed by the owner of the building to see the work is carried out in accordance with the drawings and specification produced by the architect and the bills of quantities drawn up by the quantity surveyor. This person is the clerk of the works. A competent clerk of works must have three important qualities integrity, ability and vigilance. They should have an extensive knowledge of building and civil engineering operations and practices. The clerk of works must posses a degree of tact when dealing with people, the ability to negotiate rather than dominate, and a sharp eye for detail. ...read more.

Middle

A good clerk of works can make an enormous difference to work on site in terms of defects, efficiency and general atmosphere. The duty of the clerk of works is to inspect and the contractor must give him every reasonable facility. So basically in practice, that means that the contractor should not hinder the clerk of works and he must be allowed access to all parts of the works. Although the contractor can not be expected to go to great lengths to enable him to inspect the building. If the clerk of works gives a direction to the contractor, it is of no effect. So this means that not only can the contractor ignore it but also that he is in breach of contract if he takes action, on account of the direction. ...read more.

Conclusion

The clerk of works is not employed to give directions, even directions which may be ignored. The duty of the clerk of works is to the employer. He has no duty towards the contractor to find defects. The approval of the clerk of works counts for nothing. A negligent clerk of works will not remove liability from the architect so far as the employer is concerned, but if the employer successfully sues the architect for negligence, the damages payable by the architect may be reduced on account of the negligence of the clerk of works, So in conclusion the clerk of works, job is purely to inspect. He is empowered to look and to note that is all. If he issues directions, the contractor should not act on them, unless of course they relate to obvious defects, until they are confirmed. Confirmation by the contractor is not effective. Thanks for listening ...read more.

The above preview is unformatted text

This student written piece of work is one of many that can be found in our University Degree Architecture section.

Found what you're looking for?

  • Start learning 29% faster today
  • 150,000+ documents available
  • Just £6.99 a month

Not the one? Search for your essay title...
  • Join over 1.2 million students every month
  • Accelerate your learning by 29%
  • Unlimited access from just £6.99 per month

See related essaysSee related essays

Related University Degree Architecture essays

  1. Renewable Energy in Practice. The Energy Statement for Ashton Green Sustainable Urban Extension ...

    The blades are usually coloured light grey to blend with the sky. The length of blades is between 1.5m-40 metres and in some case even more. The tubular steel towers are in a range from 10 metres to 90 metres tall.

  2. Public Works, Public Space.

    which can be found on the outskirts of nearly every major city today. He proposed a flawlessly ordered metropolis where nothing of the old remained. He stated, "A city should be treated by its planner as a blank piece of paper, a clean table-cloth, upon which a single, integrated composition is imposed" 3.

  1. Construction Technology Complete Overview

    There may be specific requirements for the structure; e.g. a basement. The guidelines for construction foundations can be found in the Building Regulations Approved Documents A. There are many different types of foundations but the most common are pictured to the right.

  2. Building Defects

    The first issue that would require investigation is the defect on the external wall and the dislodgement of the wall plate on the existing roof. The size and placement of the crack can tell us what may be the problem.

  1. Construction Technology

    During the construction process, Tunnel Form allows the contractor to cast walls and slabs in a single operation on a daily cycle. Every 24 hours, the formwork is moved so that another tunnel can be formed. This cut down the construction time significantly.

  2. Principles of buildability and sustainable construction

    However, the system eventually broke down and it then became necessary for the clients to employ their own people to supervise the work on their buildings. These might be other craftsmen employed in this role, and called „clerks of worksâ, or they might be professionals.

  1. Project Management strategic issues

    Appointment of effective Technical and Supervision Team Project Manager to take strict decisions in ensuring the right resources in terms of design, supervision and health and safety are provided according to complexity of the project. Monitoring of work performance to be carried out by preparation of daily and weekly reports,

  2. How could materials, renewable technologies and adapted processes be used in future sustainable housing?

    The CHP system was especially useful in cutting down the site?s energy consumption in order to reach its 80% target. Using a CHP system may have been more effective for GMV due to the larger size of the site, which had over 1,000 homes compared to 100 homes at BedZED,